Gazette No.: 37/2000 Published on 15 Sep. 2000
FIXED TELECOMMUNICATION NETWORK SERVICES LICENCEIn accordance with General Condition 20 of its Fixed Telecommunication Network Service (FTNS) Licence, Hutchison Global Crossing Limited ("HGC") hereby publishes new and revised tariffs under which it will provide the following telecommunication services as follows:
Part B
DataEight (Data Services)
Service Name
Service Description
Service Charges
| Monthly Rental Charge | *Installation/External Removal Charge1 | *Internal Removal Charge2 | |
| ESCON (First 20Km cable distance between 2 customers' locations.) |
$26,262
|
$45,000
|
$22,500
|
| Each additional 10Km |
$12,620
|
$10,000
|
----------
|
Remarks:
i. The tariff above is charged per end of interface and all figures shown are in Hong Kong dollar.
ii. The provisioning lead time is 6 months from the date of order confirmation between customer and HGC.
iii. Service availability is subject to HGC's network resources current from time to time.
iv. Minimum subscription period is 12 months.
v. Any additional distance exceeds 20Km (between the 2 customers' locations) is charged in steps of 10Km.
Service Name
Fast Ethernet Link
Service Description
Fast Ethernet is a point-to-point broadband communication service at a bandwidth of 100 Mpbs. A Fibre Network Terminating Unit will be installed in both subscriber ends in compliance with IEEE 802.3u.
Service Charges
| Monthly Rental Charge | *Installation/External Removal Charge1 | *Internal Removal Charge2 | |
| Fast Ethernet (First 20Km cable distance between 2 customers' locations.) |
$27,800
|
$30,800
|
$16,000
|
| Each additional 10Km |
$7,800
|
$10,000
|
---------
|
Remarks:
i. The tariff above is charged per end of interface and all figures shown are in Hong Kong dollar.
Service Name
Service Description
Service Charges
| Monthly Rental Charge | *Installation/External Removal Charge1 | *Internal Removal Charge2 | |
| Gigabit Ethernet (First 20Km cable distance between 2 customers' locations.) |
$69,000
|
$50,000
|
$30,000
|
| Each additional 10Km |
$10,000
|
$10,000
|
---------
|
Remarks:
i. The tariff above is charged per end of interface and all figures shown are in Hong Kong dollar.
ii. The provisioning lead time is 6 months from the date of order confirmation between customer and HGC.
iii. Service availability is subject to HGC's network resources current from time to time.
iv. Minimum subscription period is 12 months.
v. Any additional distance exceeds 20Km (between the 2 customers' locations) is charged in steps of 10Km.
*****
Special Conditions applicable to Part B
The definition of "Equipment" is substituted as follows :
means the Network Terminating Unit, Digital Service Unit and Fibre Network Terminating Unit provided by HGC when the customer subscribes to HGC's Data Service; the Network Terminating Unit provided by HGC when the customer subscribes to HGC's PacketLink and AsynLink service, the Fibre Network Terminating Unit provided by HGC when the customer subscribes to HGC's Fibre service and any other equipment installed or placed by HGC at the customer's premises in order to provide the Services.
Sub-clause 2.1 is substituted as follows :
2.1 Unless otherwise specified, the Minimum Subscription Period for each of the Services in Part B is 3 months.
*****
Unless otherwise specified, all services are subject to HGC's General and Special Terms and Conditions current from time to time. All other HGC tariffed services and HGC General and Special Terms and Conditions remain the same.